Timeline

Current Step: Site Design - Master Planning  Next Step: Site Design - Schematic Design

The City is currently working on Site Design and Master Planning for both the East Fire Station and adjacent Lilac Drive. The City hopes to have the new East Fire Station completed in 2028.

About the Project Phases 

There are several key steps when it comes to building a new public facility. They can broadly be broken down into the following: 

1.

Site Acquisition 
Site acquisition is the process of identifying, evaluating, and securing land suitable for the project. 

2.

Site Design
Once a site has been selected and acquired, the City can move into the site design process. The City publishes a Request for Proposal (RFP) to seek qualified firms to design the site. Once selected, architects and engineers create detailed plans for the facility. The design phase may have multiple phases, including:

  • Design Team Selection: Selecting a firm to create a design for a project 

  • Master Planning: Developing an overall building and site concept 

  • Schematic Design: Creating building and site architectural designs 

  • Design Development: Refining of conceptual design and developing construction methods 

  • Construction Documents: Illustrating exact project design specifications and outlining expectations for the contractor 

3.

Site Preparation 
After the site design is complete, the land is cleared and made ready for construction. This can involve demolition, grading, utility relocation, and environmental mitigation. 

4.

Bidding 
At this point, the project is put out to bid for contractors to submit proposals. Bids are reviewed based on cost, qualifications, and compliance with public procurement laws.  

5.

Building 
Once all prior steps have been complete, construction may begin, following the approved design and schedule. This includes ongoing inspections, quality control, and eventual commissioning of the facility for public use.